The
following are just some typical projects completed
by JYCSC:
Main supervision projects
undertaken by JYCSC(1-38)
Main supervision projects undertaken by JYCSC
in Wuxi New District(1-50)
(注:已建为■,在建为■)
The
following are just some typical projects completed
by JYCSC:
◆ Yinhui Mansion Project
picture■
Basement: 3-floor under surface, 11.6 meters
deep, 8,877 square meters.
Enclosure of basement: Φ900 driven cast-in-place
pile, perimeter 281.6 meters.
Pile foundation: Φ800×61.15meters
31-floor over surface, 105.8 meters high, construction
area 49,307 square meters.
◆ Jinding Square Project
picture■
2-floor under surface, 10 meters deep, 4352
square meters.
32-floor over surface, 106.4 meters high, construction
area 54,800 square meters.
◆ The People’s Grand Hall of Wuxi Municipality
picture■
The largest 30-meter span pre-stressed steel
structure, construction area 24,919 meters.
◆ Bridgestone (Wuxi) Tire Co., Ltd. China Project
The largest lump-sum investment for industrial
facilities: $100 million, construction area
for 1st phase: 56,000 square meters.
◆ Baoli Square Project, 1st Phase & 2nd
Phase
1st Phase
Basement area: 22,539.12 square meters;
Construction area: 68,000 square meters.
2nd Phase:
27-floor building;
The largest basement: 26,000 square meters;
Construction area: 83,000 square meters.
◆ Wuxi Sports Center
The largest span of grid framework: 46.46meters×32meters